Tchart is very slow while plotting large set of data
Posted: Tue Nov 11, 2008 4:40 am
Hi,
I am using TChart wpf.
I have tried to plot 500000 points in tchart. It takes 5 to 6 seconds to plot the entire data, moreover it is very slow when i zoom or pan these points. I will have 6 or 7 lineseries with this much amount of data. Is there any way to optimize the performance?(I have history data not realtime).
Do i need to perform any filtering in my data source? But if do that while zooming user may not able see the data in second accuracy. what to do?
Any suggestions ?
I am using TChart wpf.
I have tried to plot 500000 points in tchart. It takes 5 to 6 seconds to plot the entire data, moreover it is very slow when i zoom or pan these points. I will have 6 or 7 lineseries with this much amount of data. Is there any way to optimize the performance?(I have history data not realtime).
Do i need to perform any filtering in my data source? But if do that while zooming user may not able see the data in second accuracy. what to do?
Any suggestions ?